DOT NG911 Initiative Historical Resources

ng911 LogoFrom 2006 to 2009, the Department of Transportation (DOT) led a community-based effort to build and test a prototype of a Next Generation 911 (NG911) network. Known as the USDOT NG911 Initiative, it was an early “rallying point” for the 911 community and one of the first projects to move NG911 from concept to reality.

Working closely with a wide range of stakeholders, the initiative’s efforts focused on two issue areas – technical/engineering and institutional/transitional. Specifically, it focused on building and testing an NG911 system architecture that could accommodate stakeholder needs as well as future technological advances.

The NG911 Initiative produced a series of products that defined and documented a comprehensive future vision for the NG911 system, as well as a broad set of resources, listed below, to facilitate national transition and inform the community on how to move to the next generation of capabilities. Note that these are historical resources and more current information may now be available.

DOT NG911 System Initiative Project Summary

NG911 Fact Sheet

NG911 System Initiative Procurement Tool Kit

NG911 System Initiative Final Cost, Value and Risk

NG911 System Initiative Final Cost, Value and Risk Analysis Executive Summary

NG911 System Initiative Final System Design Document

NG911 System Initiative Transition Plan

NG911 System Initiative Proof of Concept Testing Report

NG911 System Initiative Proof of Concept Test Plan

NG911 System Initiative Preliminary Transition Plan

NG911 System Initiative Data Acquisition and Analysis Plan

NG911 System Initiative Transition Issues Report

NG911 System Initiative Proof of Concept Deployment Plan

Executive Summary: Preliminary Analysis of Cost, Value and Risk

NG911 System Initiative: Preliminary Analysis of Cost, Value and Risk

NG911 System Initiative Human Machine Interface Design Document

NG911 System Initiative Architecture Analysis Report

NG911 System Initiative System Description and Requirements Document

NG911 System Initiative Concept of Operations

Evaluation of MAYDAY/911 Field Operational Test